You are on PERI's international website. Click here to switch to PERI USA. Click here to view all PERI websites.

Marina Bay Sands, Singapore

Project data

Location: Singapore, Singapore

3 concave-shaped hotel towers with 2,600 rooms and suites

Height: 195 m
Storeys: 55
Shell construction period: 2007 – 2009
Opening: 2010

Architect: Moshe Safdie Architects

Requirements

  • two shanks, asymmetrically bent against each other, and growing together
  • structure geometries with different curvatures with constantly changing off-set storeys of the individual elements of the building
  • only two cranes for the whole project

Customer

SsangYong Engineering & Construction, Korea

Customer's benefit

  • construction time of 4 days for a complete storey
  • minimum crane times
  • optimised work sequences
  • horizontal moving of slab tables from a safe position
  • tables can also be used for 9 m intermediate storeys
Yoon Chul Ahn
Construction manager

We are absolutely satisfied with the PERI systems and the comprehensive service which helped us with proficient engineering, logistics and jobsite support to successfully implement the project. We are able to work safely and with minimum crane utilisation with SKYTABLE and ACS – thus we need less than 4 days for one storey.

PERI solution

  • crane-independent ACS self-climbing solution for the core walls
  • crane-saving, large-area SKYTABLE large slab tables
  • continuous technical and logistics support during the construction time