You are on PERI's international website. Click here to switch to PERI USA. Click here to view all PERI websites.

Mausoleum Michniów, Poland

Project data

Location: Michniów, Poland

  • Building concept which symbolizes a traditional village hut that loses its original form and crumbles into dust over time
  • Special architecture with numerous offsets and inclinations in the walls and roof

Architect: Mirosław Nizio, Nizio Design International, Warszawa, Poland

Requirements

  • Varying roof inclinations and transfer of high loads in heights of up to 15 m
  • Sandwich walls with thicknesses between 80 cm and 150 cm, steeply inclined in part
  • Concrete roof with a thickness of 80 cm and with an inclination from 40° to 50°
  • Good concrete surface quality (without architectural concrete requirements)

Customer

Firma Budowlana „Anna Bud“ Sp. z o.o.

Bilcza, Morawica, Poland

Customer's benefit

  • Cost-effective solution for forming the complex architecture
  • Just-in-time delivery of materials
  • High-quality solution and good concrete surface results
  • Efficient working operations with PERI system formwork
  • Fast solutions through permanent on-site support provided by the PERI project manager
Rafał Adamski
Project Manager

Thanks to the professional collaboration and technical support from PERI which was already provided in the planning phase, the building could be formed and concreted quickly and easily in spite of its complex design.

PERI solution

  • Customized formwork concept
  • Use of special formwork reduced to an absolute minimum
  • Construction of the steeply inclined sandwich walls by means of TRIO panel formwork
  • Complex shoring consisting of MULTIPROP shoring towers and VARIOKIT system components, easily adaptable to suit the variable heights of the roof surfaces