You are on PERI's international website. Click here to switch to PERI USA. Click here to view all PERI websites.

VARIOKIT VTC Tunnel Carriage

Overview

Thanks to its easy handling combined with PERI engineering expertise, the VTC Tunnel Formwork Carriage always provides a clever and tailored project solution. Due to the flexible VARIOKIT Modular Construction Kit and the VTC system components for tunnel construction, the system can be flexibly adapted to match a wide range of tunnel cross-sections and designs.

The VTC Tunnel Formwork Carriage is an optimised project solution that accelerates the work process enormously. Depending on the project, it is possible to choose between an entirely manual operation or one completely equipped with hydraulic equipment. With hydraulic equipment for shuttering and striking, the efficiency of the application can be increased. Workloads are minimised for positioning, striking and moving operations.

With a range of other optional features, the performance of the tunnel formwork carriage can be adapted to suit a diversity of requirements.

  • VTC Tunnel Formwork Carriage for the cut-and-cover method
    Solutions for the monolithic, semi-monolithic and separate casting methods
  • VTC Tunnel Formwork Carriage when using mining techniques
    Solutions for the monolithic and separate casting methods

Clever solutions for different project requirements
Project-specific optimised, with rentable VARIOKIT components

Fast working operations
Simple shuttering and striking operations and easy positioning of the formwork carriage, as well as flexible options for moving procedures

Individually configurable – according to customer requirements
Various equipment combinations and assembly services


Technical Details

  • Standardized and hirable system components in the appropriate lengths for project-specific formwork carriage solutions
  • Small number of type-tested connections with standardized loads per connection type
  • Fast, site-compliant assembly
  • Easy and simple modification procedure if changes are made to the tunnel cross-section
  • Few anchors required in wall areas
  • Optionally available hydraulic support for shuttering and striking as well as lifting and lowering
  • Hydraulic-driven or mechanically-operated solutions for travelling